And so I am knitting another pair of Staggered Cable knee highs for a woman in Utah. These are extra large and I must admit that they are a sock that takes me too long to knit. I don't know if it is just trying to figure out the pattern as I have to start with a very wide cuff (large calf size) and then decrease to a narrow ankle. I did make notes on my last one but as notes go they are not of much use as the yarn I am using is a fingering weight and the pair before was a little heavier. Oh well….I am half way through and hope that I get these done before the end of the week. It is a difficult challenge…but they are looking really nice.
And they are done. Actually was a fairly fast project but so much fun to do. For the record you need 19 lengths of yarn 6 -8 yards long, depending on the width of the stripes you want to knit and a contrasting color for the toe, heel and cuff. I would say probably another 80-85 yds would do it.
These were sent to my Nephew who loves hand knitted socks and I know will appreciate them.